Interactive essay / NXT Employee Performance Matrix

Employee not performing? Don’t judge the person yet

When work falls short, the cause is often an unclear expectation or missing resources rather than the person. The NXT Employee Performance Matrix scores those two things and shows which of nine types someone is and what to fix first. Think of one person and score them below.

By Piyamin Trithipcharoenchai, Managing Partner, NXT Consulting Group. Published

Question 1 Expectation

Do their role, the results that count and their way of working match your version?

Their version of the job is not yours. Some of it matches: the role, but not the results that count, or too many equal priorities. Their role, the results that count and their way of working all match yours.

Question 2 Resources

Are money, people, tools, time, information, skill and knowledge enough?

Cannot deliver, even with full effort. Delivers, but only with overtime, borrowed help or cut corners. Delivers in normal working hours.

Example
E1 R2 Improviser
Fix first Expectation is the lower score. Re-brief before you add anything.

“I figured you’d want this.”

See Delivers things nobody asked for.
Do Redirect. Re-brief the job before adding resources.

Change the scores to find your employee’s square.

Scroll to see why it works, and how to use it in 1-on-1s and quarterly reviews.

Look around the person first

When the work is not what you hoped for, the first words that come to mind are “not capable” or “not trying.” Both point at the person, and neither tells the manager what to do differently tomorrow.

Gallup’s engagement survey has twelve questions. The first two are “I know what is expected of me at work” and “I have the materials and equipment I need to do my work right.” Gallup calls clear expectations the most basic and fundamental employee need, yet globally only about half of employees strongly agree that they know what is expected of them.

Thomas Gilbert’s Behavior Engineering Model (1978) splits what people need to perform into six factors. The organization provides three: information, resources and incentives. The person brings three: knowledge, capacity and motives. Gilbert argued that it is more cost-effective to work through them in that order, starting with information and leaving motives for last. The NXT Employee Performance Matrix borrows two parts of that order: on a tie it starts with the brief, and it looks at motives last.

Sources: Gallup, Q12 (items 1 and 2) and Rigoni and Nelson (2016). Gilbert’s six factors and their order (1978) as summarized by the WORC lab at Boise State University; the examples and labels under each factor are NXT’s reading. Q12 items © Gallup, Inc., quoted for discussion only.

What the organization provides
Information knowing what is expected Gallup Q01 E axis: Expectation
Resources money, people, tools, time Gallup Q02 R axis: Resources
Incentives pay and recognition Outside the matrix
What the person brings
Knowledge skill and know-how R axis: Resources
Capacity the aptitude they bring Where blame usually lands Only after E3 R3
Motives their own will to do it Where blame usually lands Only after E3 R3
About half of employees worldwide strongly agree they know what is expected of them
Sources: Gallup, Q12 (items 1 and 2) and Rigoni and Nelson (2016). Gilbert’s six factors and their order (1978) as summarized by the WORC lab at Boise State University; the examples and labels under each factor are NXT’s reading. Q12 items © Gallup, Inc., quoted for discussion only.

Nine types of employee, nine fixes

Read it row by row. The bottom row holds the Drifter, the Improviser and the Wanderer, whose picture of the job differs from yours. They wait to be told, deliver things nobody asked for, or work hard on the wrong job, and more resources only buy more of the wrong work. The fix for the whole row starts with a new brief.

The middle row holds the Firefighter, Core and the Rough Diamond: they know what the job is, but not what matters most. Short of resources, they become Firefighters. With enough, they become Rough Diamonds: strong, but spread across too many goals. The fix for this row starts with naming what matters most; for the Firefighter, whose lower score is Resources, it also means dropping the rest so the load fits.

The top row holds the Striver, the Grinder and the Performer, who already share your picture of the job; only resources are left. If resources are short, supply them; if stretched, add people or time before they burn out; if enough, protect the setup. The darker the square, the closer the work is to running on its own. Tap any square to read it.

E3 R1 Striver

“I know what to do. I just can’t.”

See Keeps asking for budget, people or tools.
Do Supply. Give budget, people or tools, or lower the target.
Open with “If you could have one more thing tomorrow, what would it be?”
E3 R2 Grinder

“I’ll get it done. Somehow.”

See Delivers on overtime. Burnout is near.
Do Top up. Add time or people before they burn out.
Open with “Which part of the work runs into your evenings, and why?”
E3 R3 Performer

“Done. What’s next?”

See Hits targets without rescue.
Do Sustain. Protect their setup. Don’t fix what works.
Open with “What makes your work go well, and what should I leave alone?”
E2 R1 Firefighter

“Everything is urgent.”

See Busy all day, finishes little.
Do Focus. Agree on top priorities and drop the rest.
Open with “If you could only finish three things this week, which three?”
E2 R2 Core

“It’s going fine, I think.”

See Meets targets, rarely beats them.
Do Tune. Clarify one priority, add one missing resource.
Open with “What one thing, clearer or better supplied, would lift your results most?”
E2 R3 Rough Diamond

“Which of these matters most?”

See Strong output, spread across too many goals.
Do Sharpen. Name the one result that matters most.
Open with “Of all the goals you hold, which one would hurt most to miss?”
E1 R1 Drifter

“What should I be working on?”

See Waits to be told.
Do Restart. Re-brief the job from zero, or rethink the fit.
Open with “How would you describe your job in three sentences?”
E1 R2 Improviser

“I figured you’d want this.”

See Delivers things nobody asked for.
Do Redirect. Re-brief the job before adding resources.
Open with “On your last piece of work, what did you think I wanted?”
E1 R3 Wanderer

“But I thought that was my job.”

See Productive, on the wrong work.
Do Steer. Rewrite their role, results and way of work with them.
Open with “If this role could deliver only one result, what should it be?”

Fix the lower score first

Take an Improviser (E1 R2), who delivers things nobody asked for. Add resources first and they become a Wanderer: busier and more productive, but still on the wrong work. The resources you added are spent on work nobody needs.

Re-brief first instead, and they move up to Core, then to Grinder, who knows exactly what to do. Now Resources are the lower score: add people or time and they reach Performer, with every resource going into the right work.

Now try it from your employee’s square. Press one fix at a time and see how they would act in the square it lands on. In real life one fix can move someone more than one square, or not at all; here each fix moves one square so the order is easy to see.

E3 R1 Striver
E3 R2 Grinder
E3 R3 Performer
E2 R1 Firefighter
E2 R2 Core
E2 R3 Rough Diamond
E1 R1 Drifter
E1 R2 Improviser
E1 R3 Wanderer
  1. E1 R2 Improviser
  2. E1 R3 Wanderer

Now E1 R3 Wanderer
You see Productive, on the wrong work.
An illustration of NXT’s method: each press raises one score by one. The rule: fix the lower score first; on a tie, start with the brief.

How to give clear instructions

Work that comes back wrong often went wrong the moment it was handed over. In NXT’s method, a full brief has six lines. Three set the expectation: the result, the reason and the priority. Three set the resources: the time, the budget and authority, and the help. A brief cannot supply skill or knowledge, so the squares in this chapter assume the person already has both.

Switch lines off and see where the person tends to end up. Leave out the result and they guess the job. Leave out the reason and they can follow instructions but cannot decide anything unplanned. Leave out the priority and they cannot tell what matters most. Hold back the budget or the authority and they come back to ask about everything. Leave out the priority and hold back the budget and authority too, and you get a Firefighter: “Everything is urgent.”

End every brief by asking them to say it back in their own words. If their version differs, the brief is not finished; it does not mean they did not listen. Delegating works the same way: you hand over a result with the resources and the authority to deliver it, not just a task.

Example from the text: no priority, no budget or authority
Sets the expectation
Sets the resources
A brief like this tends to leave them atE3 R3 Performer“Done. What’s next?”

The six lines and where a missing line leaves someone are NXT’s method, not a research finding.

Teach only what teaching can fix

Training works only when the gap is skill or knowledge. The NXT Employee Performance Matrix counts seven resources: the organization provides five (money, people, tools, time and information) and the person brings two (skill and knowledge). Teaching can change only the last two.

If what is missing is time, tools or information, no amount of teaching will help. And if they do not know what the job is, that is an Expectation gap, not a knowledge gap, and it needs a new brief. Tap what your employee is missing.

When the gap really is skill, NXT suggests teaching in four beats: explain the purpose, show it, let them try with you there, then let them do it alone with a review date. New hires usually start in the bottom row, so their first week should be a brief before it is training.

What is missing?
Provided by the organization
Teaching will not help
Brought by the person
Teaching changes only these 2 of 7
Understanding the job
Example
Teaching worksSkill and knowledge are the only resources teaching can change. Teach in four beats, then set a review date.

  1. Explain the purpose
  2. Show it
  3. Let them try with you there
  4. Let them do it alone, then review
The seven resources and the four beats are NXT’s method.

A 30-minute 1-on-1 agenda

A 1-on-1 is a regular meeting between a manager and one employee, and NXT’s 30-minute agenda has three parts. Minutes 0 to 10, Expectation. Let them go first: their role, the results that count, how the work gets done. Listen to the end, then compare with your version. Where the two differ is the Expectation score.

Minutes 10 to 20, Resources. Go through them one by one: money, people, tools, time, information, skill and knowledge. Ask what is missing, and what only gets done with borrowed help or overtime.

Minutes 20 to 30, find the square together and agree on one fix, with an owner and a date. In a Gallup study of 7,712 U.S. adults, employees whose managers held regular meetings with them were almost three times as likely to be engaged as those whose managers did not. The matrix helps each meeting end in a fix, not a verdict.

  1. Minutes 0 to 10Expectationthey describe, you compare
  2. Minutes 10 to 20Resourcesgo through all seven
  3. Minutes 20 to 30Square and fixone fix, an owner, a date
Almost 3 timesas likely to be engaged: employees whose managers hold regular meetings with them, compared with those whose managers do not (a Gallup study of 7,712 U.S. adults)
Opening question for this squareExample
E1 R2 Improviser
“On your last piece of work, what did you think I wanted?”
See the whole agenda
1-on-1 agenda (30 minutes)
Before you meet: has last time’s fix happened?
Your own read: E1 R2 Improviser
Opening question: “On your last piece of work, what did you think I wanted?”
Minutes 0 to 10, Expectation: they describe their role, the results that count and how the work gets done; then compare with yours
Minutes 10 to 20, Resources: money, people, tools, time, information, skill, knowledge; what is short, what is stretched
Minutes 20 to 30, square and fix: find the square together and agree on one fix
Suggested fix for this square: Redirect. Re-brief the job before adding resources.
Owner: ..................  By: ..................
Source: Harter and Adkins, Gallup (2015). The 30-minute agenda is NXT’s method.

The quarterly review: read the team

Each quarter, score everyone on the team and place them on one grid. Last quarter, four of this example team of six were in the bottom row. When most of a team is unclear on the job, the problem is not any one person but the team’s direction, and setting it is the manager’s job.

This quarter, after the manager re-briefed the team’s goals, the bottom row is empty, but the left column is as full as before: three of six are still short of resources. With the direction clear, the next limit is a plan that is under-resourced, not the people. KPIs say whether results came; the matrix says why.

Now place your own team: pick a person, then tap their square. Use the grid to choose fixes, not to grade or set pay. If it is tied to money, people will describe the job the way you want to hear it, not the way it is.

E3 R1 Striver
E3 R2 Grinder Person here: 5
E3 R3 Performer
E2 R1 Firefighter
E2 R2 Core Person here: 4
E2 R3 Rough Diamond
E1 R1 Drifter People here: 1, 3 and 6
E1 R2 Improviser Person here: 2
E1 R3 Wanderer
Crowded bottom row, 4 of 6: the team’s direction is not clear. Re-brief the whole team before fixing people one by one.
Crowded left column, 3 of 6: the plan is short of resources. Review the team’s budget, people or targets.

A hypothetical team of six
Crowded means at least two people and at least half the team. The threshold and what a crowded row or column means are NXT’s method.

When is it about the person?

The NXT Employee Performance Matrix leaves attitude until someone reaches E3 R3: the job is clear and the resources are there. If, at that point, someone still does not do what was agreed, makes no effort or walks away from the work, it is now about the person.

NXT’s steps start with a direct conversation and the evidence: what was agreed, what happened, and when. Then agree on a performance improvement plan with measurable targets, the support you will give and a review date. Write each step down; if it has to go further, this record is what you can point to.

On the legal side, section 119 of Thailand’s Labour Protection Act B.E. 2541 (1998) lists six cases in which an employer that dismisses an employee does not have to pay severance pay. Two of them matter here. One is breaking a lawful and just work rule, regulation or order after a written warning; no warning is needed in a serious case, and a warning is valid for no more than one year from the offense. The other is being absent from duty for three consecutive working days without good reason, whether or not a holiday falls in between. Falling short of targets is not one of the six. Cases differ a great deal, so check with a labor lawyer first.

Clear expectations, enough resourcesExample
3 steps to E3 R3
  1. A direct conversation with evidencewhat was agreed, what happened, and when
  2. A performance improvement planmeasurable targets, support and a review date
  3. A written warningfor breaking a lawful and just work rule, regulation or order
  4. A labor lawyer’s advicebefore any decision to dismiss
Read the performance management guide
The four steps are NXT’s method. The written warning follows section 119 of the Labour Protection Act B.E. 2541, in the English translation published by the Department of Labour Protection and Welfare (2014), which this chapter’s legal passage paraphrases, checked against the Thai text in the Royal Gazette. Section 119 was replaced by the Labour Protection Act (No. 2) B.E. 2551 (2008), and none of the later amendments, up to the Labour Protection Act (No. 9) B.E. 2568 (2025), changed it. This is not legal advice.

A summary for managers

Find the broken half. Fix it. Then judge the person.

  1. Before you decide someone is not capable, score two things: Expectation and Resources.
  2. Let them describe the job first, then compare. Where the versions differ is the Expectation score.
  3. Fix the lower score first. On a tie, start with the brief.
  4. Teaching fixes only skill and knowledge; everything else needs supplying or a new brief.
  5. End every 1-on-1 with one fix, an owner and a date.
  6. Judge attitude only once they reach E3 R3.
Example3 steps to E3 R3
E1 R2Improviser
Fix firstExpectation is the lower score. Re-brief before you add anything.
Opening question for this square“On your last piece of work, what did you think I wanted?”

Employee Not Performing? Find the Broken Half Before You Judge the Person

Short answer: Before you decide an underperforming employee can’t do the job, score two things from 1 to 3. Expectation (E): do their role, the results that count and their way of working match your version? Resources (R): are money, people, tools, time, information, skill and knowledge enough? Find their square in the NXT Employee Performance Matrix, fix the lower score first (when the scores are equal, start with the brief) and judge attitude only once they reach E3 R3.

Read the full guide: scoring, the nine types, the 1-on-1 agenda and sources

Most managers have had this day. You hand over a piece of work, it comes back wrong, you explain again and it is still not what you meant. Before long the conclusion forms: they are not good enough, or they are not trying. Sometimes that is true. Often, though, the problem sits around the person rather than in them: they picture the job differently from you, or they were never given enough to do it.

This article uses the NXT Employee Performance Matrix, a nine-square grid that scores each person on two things, Expectation and Resources, and tells you which of nine situations they are in and what to fix first. It works in a one-on-one (1-on-1) with one person and in a quarterly performance review of a whole team. The interactive version at the top of this page lets you score someone on your team; this is the full text to read and cite.

Why employees don’t meet expectations: look around the person first

When work falls short, the first explanations are usually about the person: they lack skill, they don’t care, they have an attitude problem. Each one points at the person, and none tells the manager what to do differently tomorrow, so the same people problem keeps coming back.

In Human Competence (1978), Thomas Gilbert set out six things people need to perform, known as his Behavior Engineering Model. The organization provides three: information (knowing what is expected), resources (tools, time, money) and incentives. The person brings three: knowledge, capacity and motives. Gilbert argued that it is more cost-effective to work through them in that order, starting with information and leaving motives for last. The WORC lab at Boise State University, which summarizes his model, notes (citing Chyung, 2005) that he saw deficiencies in management as the ultimate cause of poor performance.

Gallup’s research points the same way. Its 12-question engagement survey (Q12) opens with these two items: “I know what is expected of me at work” and “I have the materials and equipment I need to do my work right.” Gallup calls clear expectations the most basic and fundamental employee need, yet globally only about half of employees strongly agree that they know what is expected of them, and only one in three that they have the materials and equipment they need (Gallup, Q12).

If only about half of employees worldwide strongly agree that they know what is expected of them, check the two things a manager can fix before deciding that someone is not capable. The NXT Employee Performance Matrix reduces Gilbert’s six factors to two axes, Expectation and Resources. Incentives such as pay and bonuses stay outside it, and capacity and motives are looked at only once both axes are in place. The one exception is the Drifter: after several full briefs, that square says to rethink whether the person and the job fit.

What is the NXT Employee Performance Matrix?

The NXT Employee Performance Matrix is a 3x3 grid developed by NXT Consulting Group to diagnose why an employee is, or is not, delivering and what the manager should fix first. It is used in 1-on-1s and quarterly performance reviews. The rows are Expectation (E), scored 1 to 3 from misaligned through partly aligned to aligned. The columns are Resources (R), scored 1 to 3 from short through stretched to sufficient. Each square has a name, the sentence a manager tends to hear, what you see in the work and what to do.

NXT Employee Performance Matrix
Find the broken half. Fix it. Then judge the person.
Score each person on Expectation and Resources, find their square, then do what it says.
Expectation (E)3 Aligned
E3 R1 Striver “I know what to do. I just can’t.” See Keeps asking for budget, people or tools. Do Supply. Give budget, people or tools, or lower the target.
E3 R2 Grinder “I’ll get it done. Somehow.” See Delivers on overtime. Burnout is near. Do Top up. Add time or people before they burn out.
E3 R3 Performer “Done. What’s next?” See Hits targets without rescue. Do Sustain. Protect their setup. Don’t fix what works.
2 Partly aligned
E2 R1 Firefighter “Everything is urgent.” See Busy all day, finishes little. Do Focus. Agree on top priorities and drop the rest.
E2 R2 Core “It’s going fine, I think.” See Meets targets, rarely beats them. Do Tune. Clarify one priority, add one missing resource.
E2 R3 Rough Diamond “Which of these matters most?” See Strong output, spread across too many goals. Do Sharpen. Name the one result that matters most.
1 Misaligned
E1 R1 Drifter “What should I be working on?” See Waits to be told. Do Restart. Re-brief the job from zero, or rethink the fit.
E1 R2 Improviser “I figured you’d want this.” See Delivers things nobody asked for. Do Redirect. Re-brief the job before adding resources.
E1 R3 Wanderer “But I thought that was my job.” See Productive, on the wrong work. Do Steer. Rewrite their role, results and way of work with them.
1 Short2 Stretched3 SufficientResources (R)
  1. 1 Score Expectation (E) Ask them to describe their role, the results that count and how work gets done. Compare with your version. Score 3 if it matches, 2 if partly, 1 if not.
  2. 2 Score Resources (R) Check what the organization gives (money, people, tools, time, information) and what they bring (skill, knowledge). Score 3 if enough, 2 if stretched, 1 if short.
  3. 3 Find the square, do the fix E3 R1 means Expectation 3, Resources 1. Follow the DO line in that square. Fix the lower score first. Judge attitude only after they reach E3 R3.

Read it row by row. The bottom row is people whose picture of the job differs from yours: the more resources they get, the more wrong work they can do, so the fix for the whole row starts with a new brief. The middle row knows what the job is but not what matters most, so the fix is to name the priority, and for the Firefighter, whose lower score is Resources, to drop the rest so the load fits. The top row already shares your picture of the job, so only resources are left. The darker the square, the closer it is to E3 R3, where work runs without rescue.

How is the NXT Employee Performance Matrix different from the 9-box grid and the skill/will matrix?

The 9-box grid is a widely used talent management tool that places employees on two axes, performance and potential, to inform leadership development and succession planning decisions (Ratanjee and Gandhi, Gallup, 2024). The NXT Employee Performance Matrix scores Expectation and Resources instead, to find out why work isn’t landing and what the manager should fix first, so the two can be used together.

The skill/will matrix rates a person on skill and will (motivation) and picks one of four coaching styles: direct, guide, excite or delegate (Mind Tools, after Max Landsberg’s The Tao of Coaching, 2003). The NXT Employee Performance Matrix counts skill and knowledge as two of its seven resources, beside the five the organization provides, and looks at motivation and attitude only once someone reaches E3 R3.

How to use the matrix in three steps

Step 1: score Expectation (E)

Ask the person to describe, in their own words, their role, the results that count and how the work should be done. Listen to the end without correcting, then compare with your version. Score 3 if it matches, 2 if it partly matches and 1 if it does not. Let them speak first: if you go first, people tend to nod along and you never hear the job as they see it. Gallup advises managers to develop expectations together with employees and to be clear enough that nobody has to guess (Rigoni and Nelson, 2016).

Step 2: score Resources (R)

Go through seven resources. The organization provides five: money, people, tools, time and information. The person brings two: skill and knowledge. Score 3 if they can deliver in normal working hours, 2 if they deliver only with overtime, borrowed help or cut corners, and 1 if they cannot deliver even with full effort. Gallup stresses that materials and equipment are not just a checklist of tools: they include intangible resources such as information and empowerment, and the most effective managers ask rather than assume what their team needs (Gallup, Q12).

Step 3: find the square and fix the lower score first

Put the two scores together to find the square: E3 R1 means Expectation 3, Resources 1, the Striver. Then follow the DO line in that square. The key rule is to fix the lower score first. When the scores are equal, NXT starts with the brief, following Gilbert’s order of information first, because resources added for someone who misunderstands the job turn into more wrong work. And judge attitude only after they reach E3 R3.

Scoring guide for Expectation and Resources (NXT’s method)
ScoreExpectation (E)Resources (R)
3Role, results that count and way of working all match your versionDelivers in normal working hours
2Some of it matches: the role, but not the results that count, or too many equal prioritiesDelivers, but only with overtime, borrowed help or cut corners
1Their version of the job is not yoursCannot deliver, even with full effort

The score describes the situation now, not the person. The same employee can be E3 on one job and E1 on a new one they were handed last week, so score each main responsibility separately and score again whenever the work changes.

The nine types of employee and how to manage each

The NXT Employee Performance Matrix sorts employees into nine types by their Expectation and Resources scores. The bottom row holds the people whose picture of the job differs from the manager’s: the Drifter, the Improviser and the Wanderer. The middle row, partly aligned, holds the Firefighter, Core and the Rough Diamond. The top row, aligned, holds the Striver, the Grinder and the Performer. People move between squares as fixes land; a square is for choosing the fix, not for grading the person.

The NXT Employee Performance Matrix: nine types of employee on a 3x3 grid, Expectation (E) as rows and Resources (R) as columns, from Drifter (E1 R1) to Performer (E3 R3)

Here are all nine squares, from the bottom row up. Each has the sentence a manager tends to hear, what you see in the work, the usual cause, what to do this week and a question to open the 1-on-1.

Drifter (E1 R1): the employee who doesn’t know what to do

“What should I be working on?” They wait to be told every time and stop when the assigned task is done. Managers often read this as a lack of initiative, but the matrix says they are missing both the picture of the job and the means to do it. It is common in new hires, people moved from another team and roles that were never written down.

  • This week: re-brief the job from zero, write down the results expected in the first month and book a short weekly check-in. If they stay in this square after several full briefs, rethink whether the person and the job fit.
  • Opening question for the 1-on-1: “How would you describe your job in three sentences?”

Improviser (E1 R2): work that misses the brief

“I figured you’d want this.” They move fast and make good use of what they have, but deliver things nobody asked for. Managers who see this often say the employee “doesn’t get it.” The cause is usually a brief that named the task but not the result, so they filled the gap with a guess.

  • This week: re-brief before adding any resources. Show one example of work that is right and ask them to say back what they understood.
  • Opening question for the 1-on-1: “On your last piece of work, what did you think I wanted?”

Wanderer (E1 R3): hard work on the wrong job

“But I thought that was my job.” They are well equipped and work hard, on work that is not the role’s. It tends to happen when a role changes and nobody says so, or when the written job description differs from the work that is actually measured. Gallup notes that in many cases employees are held accountable for work that doesn’t match their job description, which can confuse and frustrate them (Gallup, Q12).

  • This week: rewrite their role, results and way of working with them, then agree which work stops and who takes it over.
  • Opening question for the 1-on-1: “If this role could deliver only one result, what should it be?”

Firefighter (E2 R1): everything is urgent

“Everything is urgent.” Busy all day, taking whatever comes in, finishing little that matters. They know what the job is, but they hold more than their time and help allow, so the urgent crowds out the important. Resources are the lower score, so the first fix cuts the load: agree on the top priorities, drop or postpone the rest, then see whether they still need more people or time.

  • This week: agree on no more than three top priorities and drop or postpone the rest. Tell the people who send them work what has been postponed.
  • Opening question for the 1-on-1: “If you could only finish three things this week, which three?”

Core (E2 R2): meets targets, rarely beats them

“It’s going fine, I think.” They meet targets without major problems but rarely beat them. Managers tend to leave this square alone because nothing is on fire, yet it is where a small push goes furthest: each axis is only one step short.

  • This week: clarify one priority and add one missing resource. Don’t try to fix everything at once.
  • Opening question for the 1-on-1: “What one thing, clearer or better supplied, would lift your results most?”

Rough Diamond (E2 R3): strong, but spread too thin

“Which of these matters most?” Skilled and well equipped, with good output spread across too many equal goals, so nothing stands out. This is often the person who keeps receiving more work because they do it well.

  • This week: name the one result that matters most this quarter and the work that can shrink.
  • Opening question for the 1-on-1: “Of all the goals you hold, which one would hurt most to miss?”

Striver (E3 R1): knows what to do, can’t do it

“I know what to do. I just can’t.” They share your picture of the job and keep asking for budget, people or tools. Some managers hear excuses; the matrix says the gap is in what the organization provides. Gallup finds that, of its 12 elements, having the materials and equipment to do the work well is the strongest indicator of job stress, and that employees get frustrated with managers or organizations that set goals which seem impossible to achieve (Gallup, Q12).

  • This week: give the budget, people or tools that are missing. If you can’t, lower the target to fit what there is, and tell them plainly which you chose.
  • Opening question for the 1-on-1: “If you could have one more thing tomorrow, what would it be?”

Grinder (E3 R2): delivers on overtime

“I’ll get it done. Somehow.” They know the job and deliver, but only by staying late, borrowing help or working weekends. The numbers look good while the person nears burnout, and the problem rarely shows in the results until the day they fall ill or resign.

  • This week: add time or people before they burn out, or move part of the work elsewhere. Don’t let overtime become the standard you praise.
  • Opening question for the 1-on-1: “Which part of the work runs into your evenings, and why?”

Performer (E3 R3): hits targets without rescue

“Done. What’s next?” They share your picture of the job, have what they need and hit targets without rescue. The manager’s job is to protect that setup: don’t route other people’s emergencies to them and don’t fix a way of working that works. This is also the right square for a conversation about growth and stretch work.

  • This week: ask what makes their work go well and keep it that way. If results still don’t come while they are in this square, it is now about the person.
  • Opening question for the 1-on-1: “What makes your work go well, and what should I leave alone?”

How to give instructions to employees and set clear expectations

To give instructions that come back right, cover the six lines of NXT’s brief. The first three set the expectation: the result, the reason and the priority. The last three set the resources: the time, the budget and authority, and the help. Then ask the person to say it back in their own words. Work that comes back wrong often went wrong the moment it was handed over, and leaving a line out tends to land the person in a particular square:

The six-line brief, and where people tend to land when a line is missing (NXT’s reading of the matrix)
LineWhat to sayIf it is missing
1 ResultWhat finished work looks like and how it will be judgedThey guess the job: Expectation drops to 1 (bottom row)
2 ReasonWhy it matters and who uses it nextThey follow instructions but can’t decide anything unplanned: Expectation 2
3 PriorityWhere it ranks against everything else they holdThey can’t tell which goal matters most: Expectation 2
4 TimeThe deadline and the dates you will check progressIt gets done on overtime: Resources 2
5 Budget and authorityBudget, tools and what they may decide aloneThey come back to ask about everything: Resources 1
6 HelpWho can help and where the information isTime lost chasing people and data: Resources 2

End every brief by asking them to say it back in their own words: what they will deliver, by when and where they will start. If their version differs, the brief is not finished; it does not mean they weren’t listening. It costs a few minutes and saves giving the same instruction twice.

How to delegate work: hand over a result, not a task

To delegate is to hand over a result together with the resources and the authority to deliver it, not to pass on tasks one at a time. You still own the outcome, but you agree in advance what they can decide alone, what needs your sign-off and when you will review. Take the work back at the first problem and they learn to wait, sliding toward the Drifter square.

Work you have to brief every week should be written down as a standard procedure, so the team works systematically without waiting for you. See the business process and SOP guide.

How to train employees effectively

Training works only when the gap is skill or knowledge. When work falls short, the first fix many companies reach for is training, but of the seven resources in the NXT Employee Performance Matrix, those are the only two teaching can change. If time, tools, money, people or information is short, no amount of training helps; if the person doesn’t know what the job is, they need a new brief. When the gap really is skill, NXT suggests teaching in four beats: explain the purpose, show it, let them try with you there, then let them do it alone with a review date.

Teaching fixes two of the seven resources (NXT’s method)
What is missingThe fix
Skill or knowledgeTeach it
Money, people, tools, time or informationSupply it, or lower the target to fit what there is
Knowing what the job isRe-brief, and ask them to say it back

The four beats in detail:

  • Explain the purpose: who uses the work next and what good work looks like.
  • Show it: do the real work once, saying where you make decisions and why.
  • Let them try with you there: allow small mistakes and talk about them straight away.
  • Let them do it alone, with a review date: agree when you will look at the work together instead of checking in every day.

New hires usually start in the bottom row because they don’t yet have a picture of the job, so their first week should be a brief before it is training. Longer-term employee development also needs clear job levels and career paths; see the Organization Development guide.

A 30-minute 1-on-1 meeting agenda

A 1-on-1, or one-on-one, is a regular meeting between a manager and one employee. NXT’s 30-minute agenda has three ten-minute parts: Expectation, then Resources, then finding the square together and agreeing on one fix, with an owner and a date. In a Gallup study of 7,712 U.S. adults, employees whose managers held regular meetings with them were almost three times as likely to be engaged as those whose managers did not (Harter and Adkins, 2015). Yet many 1-on-1s end with a general impression and nothing agreed. The agenda below is NXT’s method for ending each one with a fix.

  • Minutes 0 to 10, Expectation: they describe their role, the results that count and how they work, first. Listen to the end, then compare with your version. Where the two differ is the E score.
  • Minutes 10 to 20, Resources: go through them one by one: money, people, tools, time, information, skill and knowledge. Ask what is missing, and what only gets done with borrowed help or overtime.
  • Minutes 20 to 30, square and fix: find the square together and agree on one fix, with an owner and a date.

Start the next 1-on-1 by checking whether the last fix happened. If you promised a tool and didn’t deliver it, the low Resources score is yours to fix, not theirs. The opening question for each square is in the nine types above, and the interactive version at the top of this page copies an agenda for your employee’s square.

The quarterly performance review: read the whole team

At each quarterly performance review with the NXT Employee Performance Matrix, score Expectation (E) and Resources (R) for everyone on the team, record the square and the agreed fix, and track the changes from quarter to quarter. The record can be simple.

Example quarterly record: the first three people of the example team in the interactive version above (hypothetical)
EmployeeLast quarterThis quarterAgreed fixOwner and deadline
Person 1E1 R1 DrifterE3 R1 StriverGet the missing tool, or lower the targetTeam lead, before the next 1-on-1
Person 2E1 R2 ImproviserE3 R2 GrinderMove the weekly report to an assistantTeam lead, by month end
Person 3E1 R1 DrifterE2 R1 FirefighterPick three top priorities, postpone the restTeam lead, this week

Put the whole team on one grid

Placing everyone on one grid shows problems that reviewing people one at a time misses. NXT reads the grid with a simple threshold: a row or column is “crowded” when it holds at least two people and at least half the team, and reads a crowded row or column as follows.

  • Crowded bottom row: the team’s direction is unclear, and the problem is not any one person. Re-brief the team’s goals before fixing anyone individually. Turning company goals into team work is covered in the strategy execution guide.
  • Crowded left column: the plan is short of resources. Review the team’s budget, people or targets before concluding that the people can’t deliver.
  • Most people at E3 R3: protect what makes the team work, then look at individuals.
  • Neither the bottom row nor the left column crowded: fix person by person, square by square.

KPIs say whether results came; the matrix says why

The NXT Employee Performance Matrix does not replace KPIs. Indicators tell you whether results came; the matrix tells you why they did or didn’t, and where to fix. If you don’t yet have KPIs that cascade from company goals to each person, see cascading KPIs and OKRs and the performance management guide.

Use the matrix to choose the fix, not to grade people or set pay. If the scores are tied to money, people will describe the job the way the manager wants to hear it, not the way it is, and the matrix stops working. Pay needs its own structure; see how to set employee salaries in Thailand.

When is it the employee’s attitude?

The NXT Employee Performance Matrix leaves attitude until someone reaches E3 R3: the job is clear and the resources are there. If, at that point, someone still doesn’t do what was agreed, makes no effort, neglects their duties or walks away from the work, it is now about the person. Waiting until this point has one advantage: when you have the conversation, both of you know that an unclear job and missing resources have already been dealt with.

NXT suggests four steps. Only the written warning appears in the law (section 119, below); the other three are NXT’s method.

  • A direct conversation with evidence: what was agreed, what actually happened and the dates.
  • A performance improvement plan: measurable targets, the support you will give and a review date, recorded each time.
  • A written warning: when a lawful and just work rule, regulation or order has been broken.
  • A labor lawyer’s advice: before any decision to dismiss.

On the legal side in Thailand, section 119 of the Labour Protection Act B.E. 2541 (1998) lists six cases in which an employer that dismisses an employee does not have to pay severance pay. Two of them matter here. One is breaking a lawful and just work rule, regulation or order after a written warning; no warning is needed in a serious case, and a warning is valid for no more than one year from the offense. The other is being absent from duty for three consecutive working days without good reason, whether or not a holiday falls in between. Falling short of targets is not one of the six. If the employer does not state the cause in the termination letter, or tell the employee at the time of termination, it cannot rely on that cause later. Cases differ a great deal, so check with a labor lawyer first. This paragraph paraphrases the English translation published by the Department of Labour Protection and Welfare (2014), which the department compiled for study and reference. The paraphrase was checked against the Thai text of section 119 in the Royal Gazette. Section 119 was replaced by the Labour Protection Act (No. 2) B.E. 2551 (2008), and none of the later amendments, up to the Labour Protection Act (No. 9) B.E. 2568 (2025), changed it (the Office of the Council of State’s consolidated text through No. 7 and the Royal Gazette texts of No. 8 and No. 9, all in Thai).

A fair process for underperformance, from the evidence-based conversation to the performance improvement plan, is set out in the performance management guide.

When the people problem belongs to the whole organization

If several teams have a crowded bottom row at the same time, or many of your best people are stuck as Grinders, the cause usually lies in the structure: overlapping roles, unclear decision rights or goals that never reach the teams. Fixing it at that level means looking at the organization’s structure, job scopes and performance system together. NXT helps companies design these; see organization design and restructuring consulting.

Where the ideas and figures come from

The NXT Employee Performance Matrix, its square names and the three-step rule are NXT Consulting Group’s framework, not the 9-box grid used to review performance and potential. The scoring guide, the seven resources, the six-line brief and how each line maps to a square, the four teaching beats, the opening questions, the 30-minute agenda, the team reading and its threshold, and the four steps before a dismissal (except the written warning, which follows section 119) are NXT’s method, not research findings. Facts and figures in this article come from the sources below, opened on November 27, 2026. The legal passages paraphrase the English translation of the Act, checked against the Thai text of section 119.

Frequently asked questions

How should I handle an underperforming employee?
Before deciding they can’t do the job, score two things from 1 to 3. Expectation: do their role, the results that count and their way of working match your version? Resources: are money, people, tools, time, information, skill and knowledge enough? Find their square in the NXT Employee Performance Matrix and fix the lower score first; if the scores are equal, start with a new brief. Look at attitude only once both scores are 3.
How can I tell whether an employee lacks ability or just doesn’t know what to do?
Ask them to describe their job first: the role, the results that count and how it should be done. If their version differs from yours, the problem is expectation, not ability, and the fix is a new brief. If it matches but they still can’t deliver, look at resources, and teach only when the gap is skill or knowledge. In the NXT Employee Performance Matrix, only when they score 3 on both and results still don’t come is it about the person’s capability or attitude; the one exception is a Drifter whom several full briefs leave at E1 R1, where the square itself says to rethink the fit.
What are the nine types of employee in the NXT Employee Performance Matrix?
The NXT Employee Performance Matrix has nine types, from two scores, Expectation and Resources. The bottom row, whose picture of the job differs from the manager’s, needs a new brief: the Drifter, the Improviser and the Wanderer. The middle row, partly aligned, needs one clear priority: the Firefighter, Core and the Rough Diamond, and the Firefighter also needs the rest of the load cut. The top row is aligned and down to resources: the Striver, the Grinder and the Performer. Supply what is short, and protect what works. Each type describes the person’s situation now, not their character, so the same person moves squares when the manager fixes the right thing.
How should I give instructions or delegate work so it comes back right?
NXT’s brief covers six lines. Three set the expectation: the result you need, why it matters and where it ranks against their other work. Three set the resources: the deadline and check-in dates, the budget and authority to decide, and who can help. Then ask them to say it back in their own words; if their version differs, the brief is not finished. To delegate, hand over the result with the resources and the authority to deliver it, not tasks one at a time, and agree in advance what they can decide alone.
How do I set clear expectations with an employee?
Agree on three things with them, the first three lines of NXT’s brief: the result you need and how it will be judged, why it matters and who uses it next, and where it ranks against their other work. Gallup advises managers to develop expectations together with employees and to be clear enough that nobody has to guess (Rigoni and Nelson, 2016). Then ask them to describe the role, the results that count and how the work should be done in their own words; if their version differs from yours, the expectation is not yet set.
How do I train an employee so it actually works?
First check that the gap really is skill or knowledge: of the seven resources in the NXT Employee Performance Matrix, those are the only two teaching can fix. If time, tools, money, people or information is short, supply it or lower the target; if they don’t know what the job is, re-brief. When the gap really is skill, NXT suggests teaching in four beats: explain the purpose, show it, let them try with you there, then let them do it alone with a review date.
What is a 1-on-1, and what should the agenda cover?
A 1-on-1 is a regular meeting between a manager and one employee about the work, what is in the way and what the manager needs to provide. NXT’s 30-minute agenda has three parts. Minutes 0 to 10: they describe their role, the results that count and how they work, and you compare with your version. Minutes 10 to 20: go through the seven resources and ask what is short or stretched. Minutes 20 to 30: find their square in the NXT Employee Performance Matrix together and agree on one fix, with an owner and a date. Open the next 1-on-1 by checking that fix.
How do I use the NXT Employee Performance Matrix in a quarterly performance review?
Each quarter, score everyone’s Expectation and Resources on the NXT Employee Performance Matrix, record the square and the agreed fix, and put the whole team on one grid. In NXT’s reading, a crowded bottom row (at least two people and at least half the team) means the team’s direction is unclear, so re-brief the team first. A crowded left column means the plan is short of resources, so review budget, people or targets. Use it alongside KPIs: KPIs say whether results came, the matrix says why.
Can I use the NXT Employee Performance Matrix to grade employees or set pay and bonuses?
It is better not to. The NXT Employee Performance Matrix is for choosing the fix. If the scores are tied to money, people will describe the job the way the manager wants to hear it rather than the way it is, and the matrix stops working. Base pay decisions on KPIs, actual results and the company’s salary structure.
What should I do when an employee refuses instructions, stops trying or walks off the job?
First check whether they are at E3 R3 in the NXT Employee Performance Matrix. If not, fix expectation or resources first. If they are, follow NXT’s steps: a direct conversation with evidence, a performance improvement plan with measurable targets and a review date, and a record of every step. Under section 119 of Thailand’s Labour Protection Act, dismissal without severance for breaking a lawful and just work rule, regulation or order requires a written warning first, except in serious cases, and absence from duty for three consecutive working days without good reason is a separate case in the same section. Falling short of targets is not one of the six cases that section lists. Details vary a great deal, so check with a labor lawyer before any decision.
What is the 9-box grid, and how is it different from the NXT Employee Performance Matrix?
The 9-box grid is a widely used talent management tool that places each employee in one of nine boxes by performance and potential, to inform leadership development and succession planning decisions (Ratanjee and Gandhi, Gallup, 2024). The NXT Employee Performance Matrix places them on Expectation and Resources to find out why work isn’t landing and what the manager should fix. The 9-box helps decide who gets the next opportunity; the NXT matrix says what the manager should do differently tomorrow. They can be used together.
What is the skill/will matrix, and how is it different from the NXT Employee Performance Matrix?
The skill/will matrix rates a person on skill and will (motivation) and picks one of four coaching styles: direct when both are low, guide when will is high but skill is low, excite when skill is high but will is low, and delegate when both are high (Mind Tools, after Max Landsberg’s The Tao of Coaching, 2003). The NXT Employee Performance Matrix counts skill and knowledge as two of seven resources, beside the five the organization provides (money, people, tools, time and information), and looks at motivation and attitude only once someone reaches E3 R3. The manager fixes the brief and the resources first, and only then decides whether it is about the person.

The NXT Employee Performance Matrix, its square names and the three-step rule are NXT Consulting Group’s framework. Sources were opened on November 27, 2026: Gallup (Q12; Rigoni and Nelson, 2016; Harter and Adkins, 2015; Ratanjee and Gandhi, 2024), Mind Tools on the skill/will matrix, the summary of Gilbert (1978) by the WORC lab at Boise State University, the English translation of the Labour Protection Act B.E. 2541 published by the Department of Labour Protection and Welfare (2014), which the legal passages paraphrase, and the Thai text of section 119 in the Royal Gazette (2008), which they were checked against. The Office of the Council of State’s consolidated text through No. 7 and the Royal Gazette texts of Nos. 8 (2023) and 9 (2025) show that no later amendment, up to No. 9, changed section 119. The scoring guide, the seven resources, the six-line brief and how each line maps to a square, the four teaching beats, the opening questions, the 30-minute agenda, the team reading and its threshold, and the four steps before a dismissal (except the written warning, which follows section 119) are NXT’s method, not research findings. The example team and record are hypothetical. This article is general information, not legal advice. Prepared by NXT Consulting Group.

Share this article